DIBIS 320-MWPower Plant Construction
Engineering, Procurement, Construction, Commissioning, and Erection of DIBIS 2x160 MW Gas Turbine Power Plant.
Country: Iraq
Region: Kirkuk
Status: InProgress
Completion year:
Client: Ministry of Electricity of Iraq
Operation and Maintenance of Al-Sadir 320MW Power plant
The main area of project scope was operation & maintenance of two V94.2 Siemens units as well as supply of consumables and training the local staff. After two years of Operation the project handed over to local operators on April 2013.
Country: Iraq
Region: Baghdad
Status: Completed
Completion year:
Client: Ministry of Electricity of Iraq
Al-Sadr 324MW Power Plant
Engineering, supply of material & equipment, procurement, construction & first running in all sections of civil, mechanical, electrical works of the 2x162 MW open cycle gas turbine power station, located in Al-Sadr city, in Baghdad, Iraq.
Country: Iraq
Region: Baghdad
Status: Completed
Completion year:
Client: Ministry of Electricity of Iraq
Gas Transmission Project from Iran to Armenia
Engineering, soil and construction works related to gas pipeline execution, supply, production, delivery of equipment, laying and commissioning of approximately 40 kM of  natural gas pipeline between Megri and Kadjaran.
Country: Armenia
Region: Megri and Kadjaran
Status: Completed
Completion year:
Client: High Voltage Electrical Networks
Water Treatment Plants (10 Projects)
Design, supply, and supervision of Banes, guanta,  Jesus Menendez,  La Maya & Palma Soriano water treatment plant and also the supply of equipment, including horizontal and deep well pumps, for Las Tunas, Camaguey, havana and Holguin city pumping station.
Country: Cuba
Region: Havana
Status: Completed
Completion year:
Client: Cuba Hidraulica
Senegal Transmission Lines & Substations
Design, procurement, construction and commissioning of Tobene-Touba-Kaolack 225/30 KV transmission lines and substations in Senegal.
Country: Senegal
Region: Tobene-Touba-Kaolack
Status: Completed
Completion year:
Client: Senegal Electricity Company
Transmission Lines & GIS substation
Design, survey, manufacturing, test, delivery, installation, and commissioning of 220 KV double circuit  transmission lines between Iran’s border and Gwadar (75 km) and GIS S/S in Gwadar.
Country: Pakistan
Region: Gwadar
Status: InProgress
Completion year:
Client: National Transmission and Dispatch Company
Gwadar Phase II
Procurement of  13* 250 MVA, 220/132 KV  Auto Transformers manufactured by Iran Transfor
Country: Pakistan
Region: Gwadar
Status: InProgress
Completion year:
Client: National Transmission and Dispatch Company
220/132 KV AIS Substations
Design, procurement, manufacturing, delivery, installation, commissioning  and test of  220 / 132 KV  AIS Substations in Khuzdar, city of  Baluchistan.
Country: Pakistan
Region: Khuzdar
Status: InProgress
Completion year:
Client: National Transmission and Dispatch Company
Iran - Armenia Third Power Transmission Line and Related Substations
Design, engineering, procurement, and construction of Iran–Armenia 400 KV third power transmission line and its related substation.
Country: Armenia
Region:
Status: InProgress
Completion year:
Client: High Voltage Electrical Networks
Irrigation Project in the City of Ashgabat
Study, design, supervision, construction of reservoir, pumping and plumbing works, installation of equipments and civil works of  irrigation project in Turkmenistan.
Country: Turkmenistan
Region: Ashgabat
Status: Completed
Completion year:
Client: Ministry of Energy & Industry of Turkmenistan
Irrigation Project & Tunnel
Construction of tunnel for irrigation of south desert of Halab
Country: SyrianArabRepublic
Region: Halab
Status: Completed
Completion year:
Client: Ministry of Irrigation & General Organization for Land Development
Extension of the 220 KV Existing Substation
Extension of the 220 KV existing Substation (as an EPC Project) in Bahir Dar, Gondar and Shehedi of Ethiopia.
Country: Ethiopia
Region: Bahir Dar
Status: Completed
Completion year:
Client: Ethiopian Electric Power Corporation
Rural Electrification Project
Rural Electrification EPC Project 33KV & LV Distribution Substations and Transmission Lines.
Country: SriLanka
Region:
Status: InProgress
Completion year:
Client: Ministry of power and energy
Power Transmission from Turkmenistan to Afghanistan
Design, engineering, procurement, and construction of 110 KV power transmission line and its related substation.
Country: Afghanistan
Region:
Status: InProgress
Completion year:
Client: Ministry of Energy and Water of Islamic Republic of Afghanistan
Design& Supply The Equipment for 6 x 66/20 KV Conventional Substations
Design, manufacturing & supply the materials & equipment for 6 x 66/20 KV conventional substations . In addition to the civil & electrical works design , supervision on erection , civil works , commission , putting into operation , testing at the factory.
Country: SyrianArabRepublic
Region:
Status: Completed
Completion year:
Client: Public Establishment for Distribution & Exploitation of Electrical Energy
330 & 220 KV Overhead Transmission Lines & Substations
Design, survey, geological studies, manufacturing, test, delivery, installation, and commissioning of 330 KV and 220 KV overhead transmission lines and substations between Imishli, Ali Bayramli, and Astara in Republic of Azerbaijan.
Country: Azerbaijan
Region: Imishli, Ali Bayramli, and Astara
Status: Completed
Completion year:
Client: Azerenrji JSC
Wind Farm
Study, design, supply, installation, test, and commissioning of the wind farm in Armenia. It covers the 4 turbines with the capacity of 2.6 MW in Pushkin-Pass.
Country: Armenia
Region: Pushkin-Pass
Status: Completed
Completion year:
Client: High Voltage Electrical Networks
Water Supply System at Niabat Jabal Akhdar In Wilayat of Nizwa
Engineering, Procurement, Construction, Transmission Reservoir, Guard Houses, Central Control Building, Distribution Area Building.
Country: Oman
Region: Niabat Jabal Akhdar In Wilayat of Nizwa
Status: InProgress
Completion year:
Client: Public Authority for Electricity and Water
Agarak Substation
          Supply, Erection and Installation of Agarak 220 KV Substation
Country: Armenia
Region: Agarak
Status: Completed
Completion year:
Client: Armenergo
Mobile Substation
Kurdistan Mobile Substation: Engineering, Procurement, Installation and Commissioning of 4 mobile Substations 132/11 KV.
Country: Iraq
Region: Kurdistan
Status: InProgress
Completion year:
Client: Ministry of Electricity of the Kurdistan Region
50-MW wind farm
50 MW Wind Farm: Study, design, supply, installation, test, and commissioning of 50-MW wind farm in Pakistan
Country: Pakistan
Region: Sindh
Status: InProgress
Completion year:
Client: Alternative Development World & Sindh Gorvernment
Distribution Transformers
1000 x 100 KVA Distribution Transformers
Country: SriLanka
Region:
Status: InProgress
Completion year:
Client: Cylon Electricity Board
Al-Bab Tadef Irrigation Project
Design, supply and erection of hydro-mechanical, mechanical, and electrical equipment required for Al-Bab Tadef irrigation project on an area of 6700 hectares.
Country: SyrianArabRepublic
Region: Al-Bab Tadef
Status: Completed
Completion year:
Client: General Organization for Land Development